NVIDIA vs. Enterprise Support / DGX Premium
Battle Card · NVIDIA DGX A100

NVIDIA DGX A100 Maintenance
side by side.

TechCare TPM vs. Enterprise Support / DGX Premium. Cost range, EOSL advantages, migration path and DACH compliance at a glance — for IT leadership and procurement.

12–20 % OEM list-price share per year
50–65 % EOSL savings vs. OEM
5–10 % Multi-year discount (3–5 yrs)
One contract for all lines · Fixed price in 48 h techcaresolutions.de
01

Cost comparison

OEM list-price share approx. 12–20 % of list price per year (DGX Premium higher)

Example NVIDIA DGX A100 with 4-year Enterprise Support: TechCare TPM roughly 41–50% below the OEM price.

EOSL hardware: On EOSL hardware (DGX-1, DGX Station A100, V100/T4 generation) 50–65 % savings vs. Enterprise Support — NVIDIA EOSL extension on DGX limited.
Multi-year contract: 3-year TPM contract: additional 5–10 % discount, 5-year contract: 10–15 %. Plus fixed-price lock against OEM list-price increases.

Active EOSL lines

  • DGX A100 (320GB / 640GB) · EOSL 2028-12-31
  • DGX H100 · EOSL 2030-12-31
  • DGX H200 / DGX GH200 · EOSL 2031-12-31
  • DGX GB200 NVL72 · EOSL 2032-12-31
02

Which DGX models we service

DGX A100 · Ampere generation
DGX A100 320GB (8x A100 40GB) · DGX A100 640GB (8x A100 80GB)
DGX H100 / H200 · Hopper generation
DGX H100 (8x H100 SXM5 80GB) · DGX H200 (8x H200 141GB)
DGX GH200 · Grace Hopper
DGX GH200 (Grace+H100, 256x GH200 superchips, 144TB memory)
DGX GB200 NVL72 · Grace Blackwell
DGX GB200 NVL72 (72x B200 GPU + 36x Grace, liquid-cooled rack-scale)
Components
GPU boards · NVLink/NVSwitch · power supplies · cooling loop (GB200) · networking modules

Generation status of DGX line

GenerationReleasedEnd of vendor supportTechCare TPM
DGX A100 320GB2020ca. 2028+Supported
DGX A100 640GB2020ca. 2028+Supported
DGX H1002022ca. 2030+Supported
DGX H2002024ca. 2031+Supported
DGX GH2002024ca. 2031+Supported
DGX GB200 NVL722024–2025ca. 2032+Supported
03

Why TPM maintenance for NVIDIA DGX

DGX maintenance is the absolute highest-value lever in the TPM market. NVIDIA factory warranty for DGX typically runs 1-3 years, then standard or premium support becomes due — proportional to hardware value: typically 15-25 percent per year. For platforms with very high hardware value such as DGX H100 or DGX GB200 NVL72, maintenance thus becomes one of the largest recurring cost items in the data center. TPM reduces this to 30-50 percent — for an 8-box DGX cluster, these savings apply to every box — a substantial annual lever.

We service DGX platforms with OEM components from our own warehouse and certified refurbishing sources — DGX hardware is proprietary (NVLink topology, NVSwitch backplane, NVIDIA-specific power delivery, plus liquid cooling loop from GB200), component availability is structurally weaker than for standard servers. We continuously build the component pool for current DGX generations, with focus on GPU board replacement, NVSwitch modules and power supplies. Our engineers are specifically trained for DGX architecture — DGX maintenance is not comparable to standard x86 server service. CUDA, AI Enterprise, Base Command stay license-free active under TPM (software subscriptions run independently of hardware maintenance with NVIDIA).

04

OEM vs. TechCare — where the switch pays off

The full OEM-vs-TPM matrix (spare parts, SLA tiers, language, sub-outsourcing, compliance docs, reporting) is the same for every Nvidia line — see the Nvidia battle card.

Stays with NVIDIA

  • NVIDIA AI Enterprise software subscription
  • DGX OS / Base Command subscription
  • NVIDIA TAC software tickets

Moves to TechCare

  • Hardware defects (memory, disk, PSU, mainboard, modules)
  • 24×7×4 on-site SLA with German-speaking field service
  • Spare-parts logistics DACH + global hub network
  • Fixed-price contract in 48 h, one inventory — one contract
05

DACH compliance by design.

BAIT/MaRisk documentation package, DORA Art. 28 contract template, ISO 27001 and GDPR-compliant media handling apply identically to every Nvidia line — details on the Nvidia battle card.

06

Migration path from first contact to hand-over.

Same four steps for every Nvidia line: inventory → fixed-price quote in 48 h → contract (BAIT/MaRisk/DORA hooks) → hand-over with spare-parts provisioning. Details on the Nvidia battle card.

07

FAQ on DGX maintenance

Which DGX models do you service?
Current DGX family: DGX A100 (Ampere, 320GB and 640GB variants), DGX H100 (Hopper, 8x H100 SXM5 80GB), DGX H200 (Hopper refresh, 8x H200 141GB), DGX GH200 (Grace Hopper, 256x GH200 superchips with 144TB memory) and DGX GB200 NVL72 (Grace Blackwell, 72x B200 GPU plus 36x Grace, liquid-cooled rack-scale). Including all GPU boards, NVLink/NVSwitch modules, power supplies, cooling loop (GB200) and networking modules. For older DGX-1/-2 we have a separate spoke (DGX Legacy).
What does TPM cost for DGX compared to NVIDIA support?
30 to 60 percent savings. Specifically: for DGX A100 640GB with 24×7×4, TechCare is typically roughly 60% below NVIDIA premium support, as it is for DGX H100 and DGX GH200; DGX H200 similar. For the DGX GB200 NVL72 it is roughly 55–60% below NVIDIA premium. For an 8-box DGX H100 cluster, TechCare is also roughly 60% below the NVIDIA price — year after year.
Do CUDA, AI Enterprise and Base Command Manager continue to work without an NVIDIA contract?
Yes. CUDA toolkit, GPU drivers and all DGX-OS functions continue to work license-free on the hardware — all AI workloads (PyTorch, TensorFlow, Triton Inference, NeMo) stay functional. NVIDIA AI Enterprise as software subscription runs separately from hardware maintenance — customers actively using the subscription keep it with NVIDIA. Base Command Manager (BCM, cluster orchestration) is subscription-based and independent of maintenance contract. CUDA updates and newer GPU driver versions are freely available from NVIDIA — TPM customers can download them without restriction. Firmware updates on NVSwitch/BMC require an active NVIDIA contract but are usually uncritical with stable AI workloads.
How is component availability for DGX hardware?
Structurally weaker than for standard servers, but addressed with targeted component pool buildup. DGX hardware is proprietary — NVLink topology, NVSwitch backplane, NVIDIA-specific power delivery boards. We stock replacement GPU boards, NVSwitch modules, power supplies and networking modules for DGX A100/H100/H200. For very new generations (GH200, GB200), pool depth is limited — there we recommend hybrid setups: TPM for standard components (power supplies, fans, storage) plus selective NVIDIA subscription for GPU board coverage. At contract conclusion we create a risk assessment per DGX model — for critical workloads we recommend on-site spare components (negotiable in contract).
Which SLA levels do you recommend for DGX?
DGX in productive AI training workloads: 24×7×4 with German-speaking onsite engineer is standard. AI training jobs are often multi-day — outage of a DGX box mid-training means loss of training progress and possibly data loss. For AI inference production workloads (customer-facing LLMs, computer vision pipelines), 24×7×4 is mandatory due to direct service impact. For DGX in test/dev environments or as backup compute, 5×9 NBD can be economical. DGX GB200 NVL72 as liquid-cooled rack-scale system: 24×7×4 mandatory due to cooling loop complexity — cooling failure has high impact.
When is the natural entry point for TPM with DGX?
Factory warranty expiration. NVIDIA factory warranty for DGX typically runs 1-3 years depending on contract. Specifically: DGX A100 fleets from 2020-2022 have been out of factory warranty since 2023+ and are the natural TPM entry point. DGX H100 from 2022-2023 will run out of factory warranty from 2025-2026. DGX H200/GH200/GB200 are current — TPM is to be planned 1-3 years ahead here. We recommend: inventory check 6 months before warranty expiration, TPM contract from day 1 after warranty end — no gap, no NVIDIA standard support extension at full price as bridge.