Arista Networks vs. A-Care
Battle Card · Network

Arista Networks Maintenance
side by side.

TechCare TPM vs. A-Care. Cost range, EOSL advantages, migration path and DACH compliance at a glance — for IT leadership and procurement.

10–16 % OEM list-price share per year
50–70 % EOSL savings vs. OEM
5–10 % Multi-year discount (3–5 yrs)
One contract for all lines · Fixed price in 48 h techcaresolutions.de
01

Cost comparison

OEM list-price share approx. 10–16 % of list price per year

Example Arista 7050X3 switch with 4-year A-Care 24×7×4: EUR 2,400–3,500/year OEM, EUR 1,550–1,650/year with TechCare TPM.

EOSL hardware: On EOSL models (7050T, 7050S, 7048T, 7150 series, 7250QX) 50–70 % savings vs. A-Care — Arista EOSL cycle typically 5–7 years.
Multi-year contract: 3-year TPM contract: additional 5–10 % discount, 5-year contract: 10–15 %. Plus fixed-price lock against OEM list-price increases.
02

OEM vs. TechCare — where the switch pays off

Aspect Arista Networks A-Care TechCare TPM
Spare-parts stock OEM global logistics, often 5–10 days lead time DACH hub + global partner network, 4–8 h on site
SLA tiers 8×5×NBD to 24×7×4, often multi-year committed 24×7×4 to 24×7×2, per-device flexible
Response / language Ticket → email routing, EMEA hub mostly English Direct call, DACH field service, German native
Sub-outsourcing OEM sub-contractors, chain not always transparent Direct contract with TechCare, no black box
Compliance docs Standard OEM documents BAIT/MaRisk/DORA-ready, ISO 27001
Reporting Premium tier add-on Quarterly reports incl. ticket history standard

Stays with Arista Networks

  • EOS software licenses + major updates
  • CloudVision subscription
  • Arista TAC software tickets

Moves to TechCare

  • Hardware defects (memory, disk, PSU, mainboard, modules)
  • 24×7×4 on-site SLA with German-speaking field service
  • Spare-parts logistics DACH + global hub network
  • Fixed-price contract in 48 h, one inventory — one contract
03

DACH compliance by design.

  • BAIT / MaRisk doc package: prepared maintenance annexes for financial and insurance service providers incl. auditor notes.
  • DORA Art. 28-compliant contract template: mandatory critical-ICT-service-provider conformity from January 2025.
  • ISO 27001: TPM provider certified, sub-contractor chain documented, access-log standards enforced.
  • Data protection: GDPR-compliant media handling — disk retention or NIST 800-88 wipe before hardware return.
04

Migration path from first contact to hand-over.

  1. Inventory Arista Networks install base (PIDs/serials or smart-account export, any format — Excel/CSV/PDF).
  2. Quote in 48 h Fixed-price offer per line + bundle total. SLA tier, term (1–5 yrs), optional add-ons transparently listed.
  3. Contract Template review (BAIT/MaRisk/DORA hooks integrated), compliance annex, signature — typically 5–10 working days.
  4. Hand-over Arista Networks OEM cancellation coordinated, spare-parts provisioning DACH hub, field-service onboarding with site walk.